Gate to the East
The Gate to the East is the tallest building in Suzhou, Jiangsu, China and is intended to be a symbolic gateway to the city. At a height of 301.8 m (990 ft), the office building has been described as the largest gateway building in the world.
Built between 2004 and 2016, The Gate to the East was designed by British architectural practice RMJM, and cost US$700 million. The location was chosen to mark the intersection of the historic east-west axis of Suzhou Old Town and the west bank of Jinji Lake.
The two-columned tower rises above the lake and is adjoined by a towering arch. It sits directly above a major underground rail interchange which is fully integrated into the building.
Despite being praised for its acknowledgement of geographical and cultural context, it has received considerable media criticism, with some commentators referring to it as a climactic icon of 21st century ‘architecture of spectacle’. Others have derided it as resembling a giant pair of trousers, with locals calling it ‘humiliating’ and describing walking through its gaping arch as ‘like being forced to crawl between someone else’s legs’.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation which closes 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.